Mastering Subcontractor Procurement: A Strategic Guide for Construction Businesses
Construction Insider logo

Mastering Subcontractor Procurement: A Strategic Guide for Construction Businesses

Day / Night Icon
Construction Insider - Arrow Left
Back to the Toolbox

Mastering Subcontractor Procurement: A Strategic Guide for Construction Businesses

The involvement of subcontractors forms the foundation of the construction industry. It is widely acknowledged that subcontractors typically represent approximately 90% of the total build cost. This significant proportion underscores the pivotal role that effective subcontractor procurement plays in determining the overall success of any construction project. 

From managing budgets, following strict deadlines, to ensuring the highest quality standards, the process of selecting and engaging the right subcontractors has an impact on every level of a project. Despite its importance, subcontractor procurement often does not receive the focused attention it warrants. 

This guide aims to provide a comprehensive outline of practical steps that construction businesses can adopt to elevate their subcontractor procurement processes, achieve effective cost management, and ultimately guarantee project success.

The success of any construction project hinges on the collaborative efforts of a team of highly skilled specialist subcontractors. Each subcontractor brings a unique set of expertise, which is indispensable for efficiently and effectively delivering distinct phases of a build to a high standard. To illustrate this diversity, consider the following common subcontractor specialisations:

1. Site Preparation Subcontractors:

These contractors are responsible for the initial groundwork, including demolition, land clearing, excavation, and ensuring a stable foundation for subsequent construction activities. Thorough site investigation and preparation are critical, as poor groundwork can lead to significant risks and complications later in the project.

2. Concrete Subcontractors:

Specialising in all aspects of concrete work, these subcontractors handle the pouring of foundations and structural concrete elements, including the installation of precast components. The strength and quality of their work are paramount to the structural integrity of the entire building.

3. Electrical Subcontractors:

These contractors manage all wiring, installations, and electrical systems, which are essential for the safety, functionality, and regulatory compliance of the building. Their expertise extends to both low-voltage systems for lighting and data, as well as high-voltage systems for power distribution, fire alarm systems, and security installations.

4. Plumbing Subcontractors:

Ensuring the proper installation of water supply, drainage, and heating systems is their core responsibility. They handle the intricate network of pipes and sanitary fixtures, playing a crucial role in building performance, water conservation, and adherence to plumbing regulations.

5. Carpentry Subcontractors:

Managing both the structural framing (rough carpentry) and internal and external woodwork, including doors, windows, and decorative finishes (finish carpentry), falls under their purview. Their work impacts both the structural stability and the aesthetic appeal of the building.

6. Roofing Subcontractors:

These specialists install roofs and waterproofing systems, which are vital for providing weather resistance and ensuring the long-term durability of the building envelope. They work with various roofing systems, including flat, pitched, and green roofs, using specialised waterproofing techniques.

7. HVAC and Mechanical Subcontractors:

Responsible for the installation and maintenance of heating, ventilation, and air conditioning (HVAC) systems, as well as other mechanical systems like lifts, escalators, and process piping, they ensure comfortable and energy-efficient environments.

8. Painting and Finishing Subcontractors:

Applying the final aesthetic touches, these subcontractors handle surface preparation and the application of various protective and decorative coatings, enhancing the building's visual appeal and longevity.

9. Masonry Subcontractors:

Specialising in brickwork, stonework, and blockwork, they deliver both structural strength and visual quality to a construction project, often contributing to the building's fire resistance as well.

The careful selection of the right subcontractors for each work package is instrumental in ensuring that the build progresses smoothly, meeting project deadlines and achieving the required quality standards efficiently. The diverse nature of the contractors highlights the necessity for a tailored procurement strategy for each trade.

Many construction businesses do not fully appreciate the critical role that high-quality tender documents play in the subcontractor procurement process. However, the creation of clear and detailed tender documents forms the very foundation of receiving accurate and genuinely comparable quotations. These documents serve as the primary communication tool between the main contractor and potential subcontractors, and their quality directly influences the calibre of bids received.

Moreover, they significantly increase the likelihood of receiving quotations that are not only accurate but also closely align with your project's budgetary constraints.

Poorly defined tender documents increase the potential for scope gaps and misunderstandings, which can later escalate into costly disputes with subcontractors. Therefore, investing time and effort in creating high-quality tender documents is not merely an administrative task; it is a fundamental risk mitigation strategy that underpins successful subcontractor procurement.

To streamline your subcontractor procurement process and enhance the likelihood of project success, consider implementing the following proven steps:

Step 1: Strategic Pre-Qualification and Comprehensive Due Diligence

Formal Tender Process

Effective procurement begins well before the formal tendering process with careful pre-qualification and thorough due diligence. It is advisable to aim to invite between three to five subcontractors per trade to tender. This range ensures sufficient competition while also providing a backup option should one of the invited parties withdraw. This initial screening phase is critical for filtering out potentially unsuitable subcontractors and focusing your tendering efforts on those most likely to deliver successfully.

Construction Due Diligence 

Important due diligence steps include a comprehensive evaluation of several key aspects. Firstly, reviewing the financial stability of potential subcontractors is paramount. This involves requesting and analysing recent financial statements, such as balance sheets, income statements, and cash flow statements, ideally for the past two to three years. Examining trends in their profitability, debt levels, and working capital can provide valuable insights into their financial health. Utilising credit rating agencies or financial risk assessment tools can further enhance this evaluation. Financial instability in a subcontractor can have severe repercussions, potentially leading to project delays, compromised quality, and even abandonment of work. Subcontractors with weak financial foundations may struggle to fund their operations, pay their own suppliers, or retain skilled labour, all of which can directly impact the successful delivery of your project.

Construction Experience and Capabilities 

It is crucial to check the relevant experience and capability of potential subcontractors. This entails requesting detailed information on similar projects they have successfully completed within the past five to ten years, including specifics on project size, complexity, and client references. Assessing their track record in terms of quality of workmanship, adherence to project schedules, and safety performance is essential. Reviewing their portfolio of completed projects can provide tangible evidence of their expertise and the standard of their work. Past performance serves as a strong indicator of future success, and thoroughly vetting a subcontractor's experience significantly reduces the risk of engaging with an unqualified or unreliable partner. Subcontractors with a demonstrated history of successfully delivering projects similar to yours are more likely to possess the necessary skills, established processes, and adequate resources to meet your project's specific requirements.

Workload Capacity

Verifying the capacity of the subcontractor is essential. This involves assessing their current workload and their genuine ability to take on a new project of your size and complexity. Requesting information on their current staffing levels, the availability of key personnel, and the resources they possess, including equipment, is vital. Subcontractors who are already overstretched may struggle to allocate sufficient resources to your project, potentially leading to delays and compromises in quality. A subcontractor with limited capacity might prioritise other commitments or simply lack the necessary manpower and equipment to meet the demands of your project.

Business Location 

Assessing the proximity of the subcontractor to your project site can be a significant factor. Consider their location and how it might impact their responsiveness, ease of site management, and overall project logistics. Engaging local subcontractors can often be advantageous as they may possess a better understanding of local regulations, have established relationships with local suppliers, and offer quicker response times. Geographical proximity can indeed influence communication, coordination, and the speed of reaction, particularly in time-sensitive situations. Subcontractors located closer to the project site may be able to attend site meetings more readily, respond more quickly to unforeseen issues, and potentially have lower mobilisation costs.

References

Obtaining and diligently verifying references is a critical step. Request contact details for at least three to five recent clients and project managers with whom the subcontractor has worked. Prepare a structured list of specific questions to ask these referees, focusing on the subcontractor's performance, their communication style, their problem-solving abilities, and their overall commercial reliability. References provide invaluable firsthand accounts of a subcontractor's past performance and can often reveal potential red flags that might not be apparent from their formal submissions. Speaking directly with previous clients can offer deeper insights into a subcontractor's work ethic, their level of professionalism, and their ability to consistently meet contractual obligations.

Health and Safety

It is also prudent to conduct due diligence on their health and safety record, verify their licences and insurance (including public liability, professional indemnity (if applicable), and worker's compensation insurance). Request information on their safety policies, procedures, and their track record, including incident rates and any relevant safety certifications. A poor safety record can lead to accidents on site, significant project delays, potential legal liabilities, and damage to your company's reputation. Ensuring that the subcontractor holds all necessary licences, certifications, and permits required to perform the specific work is also crucial. This will protect your business from potential legal and financial liabilities in the event of accidents, negligence, or contractual breaches.

Step 2: Provide a Measured Pricing Document (Bill of Quantities)

Providing a clear Bill of Quantities (BoQ) significantly enhances procurement efficiency (saving admin time for your company). A detailed BoQ offers numerous benefits. It ensures that all invited subcontractors are pricing against the same scope of work, resulting in genuinely like-for-like quotations. This makes the tender evaluation process much quicker and simpler. A well-defined BoQ also plays a crucial role in reducing scope gaps and minimising the potential for disputes later in the project. This simplifies the management of variations and the processing of monthly payment applications as the project progresses.

Creating an effective BoQ involves breaking down the entire project scope into clearly defined and measurable work items. For each item, provide precise descriptions and accurate quantities. It is essential to use a standardised format that is easy for subcontractors to understand and price against. Consider adopting industry-standard measurement rules and coding systems to ensure clarity and consistency. While the initial effort involved in producing a comprehensive BoQ represents an investment of time and resources, the long-term benefits are substantial. It ultimately saves significant time and cost throughout the project lifecycle and effectively reduces overall project risk.

Step 3: Draft a Clear Scope of Works

The Scope of Works document serves to define precisely what deliverables and services are expected from the subcontractors. It is imperative that this document clearly aligns with the Bill of Quantities, specifying the exact responsibilities of the subcontractor regarding design, supply, and installation. It is best practice to break down your scope clearly into sections such as Measured Works, Preliminaries, Interfaces, and Additional Considerations. 

The Measured Works section should detail the specific tasks and deliverables that directly correspond to the items listed in the BoQ. 

Preliminaries should cover general site requirements like access, security, and welfare facilities. 

The Interfaces section is crucial for explicitly defining the responsibilities of the subcontractor in relation to other trades working on the project and their interaction with the main contractor. 

Additional Considerations can include any specific requirements or constraints such as working hours, adherence to environmental regulations, or specific quality standards that the subcontractor must meet. 

To ensure complete clarity and avoid any ambiguity, clearly reference all relevant specifications, schedules, and project drawings throughout the Scope of Works document. This level of detail significantly reduces the potential for misunderstandings, improves the accuracy of the quotations received, and ultimately minimises the likelihood of costly disputes arising during the project.

Step 4: Issue Clear Invitations to Tender

Your Invitation to Tender (ITT) is the formal document that communicates your expectations to potential subcontractors. It should be structured to provide all the necessary information in a clear and concise manner  The ITT should clearly state the Tender Period, allocating realistic timeframes based on the complexity of the tender. 

For install-only tenders, a timeframe of two weeks is often appropriate. For tenders involving both supply and installation, extending this to two to three weeks is advisable. For more complex tenders that include design, supply, and installation responsibilities, a period of three to four weeks or even more may be necessary to allow subcontractors sufficient time to prepare a comprehensive response.

The ITT must also clearly define the Tender Submission Requirements, specifying the exact format in which subcontractors should present their responses. This ensures consistency across all bids, making evaluation and comparison much easier. 

Clearly state what information you require, such as a detailed price breakdown aligned with the BoQ, an indicative project programme, copies of relevant insurance certificates, and tax or Construction Industry Scheme (CIS) details. Specifying the Contractual Information upfront is also crucial. Indicate the form of contract you intend to use (e.g., JCT, NEC), outline key terms and conditions, and specify payment terms and any retention clauses. Addressing these aspects early can prevent lengthy negotiations and unexpected costs later in the process.

Providing a comprehensive Document List is essential for clarity. Include a clear index of all documents that are part of the tender package, such as the BoQ, Scope of Works, specifications, and drawings. This simplifies understanding for the subcontractors and makes it easier for them to reference the correct information when preparing their bids. 

You can consider including Value Engineering Requests within your ITT. Invite subcontractors to suggest any practical alternatives to your specified methods that could potentially lead to cost savings or enhancements in quality. Clearly outline how these suggestions should be presented for proper consideration. By structuring your ITT with these key components, you significantly increase the likelihood of receiving competitive and well-organised quotations that directly address your project goals.

Step 5: Follow-Up and Mid-Tender Meetings

Mid-tender follow-ups are a vital aspect of effective subcontractor procurement that is often overlooked. Implementing regular follow-up communication during the tendering period offers several significant benefits. 

Firstly, it serves as a timely reminder to subcontractors about the impending submission deadlines, helping to ensure that you receive a complete set of bids. 

Secondly, it provides an opportunity to address any questions that subcontractors may have early in the process. This proactive approach can prevent last-minute confusion and ensure that all bidders are operating with the same understanding of the project requirements, ultimately leading to more accurate and comprehensive bids. 

Thirdly, these interactions help to build relationships and mutual understanding between your team and the potential subcontractors, which can be beneficial for future collaborations. 

Finally, follow-up communications provide a platform to reinforce your expectations regarding the required format of the tender responses and to reiterate any specific requests, such as those related to Value Engineering proposals.

Conducting mid-tender meetings can further enhance the quality of the bids received. Schedule these meetings to address common queries that arise from the tender documents and to provide any necessary clarifications. These sessions also offer a valuable opportunity to further explain specific aspects of the project requirements and to reiterate your expectations regarding quality, safety, and programme. 

Encouraging open dialogue and actively seeking feedback from the subcontractors during these meetings can lead to a better understanding of potential challenges and innovative solutions. Ultimately, maintaining proactive communication throughout the tendering process significantly improves response rates, enhances the overall quality of the quotations you receive, and strengthens your long-term relationships with subcontractors.

Beyond the Initial Steps: Advanced Strategies for Optimising Subcontractor Procurement

Leveraging technology, such as e-tendering platforms and procurement software, can streamline the entire process, improving efficiency and transparency. Developing long-term, strategic relationships with reliable subcontractors can offer numerous benefits, including consistent quality of work and the potential for negotiating more favourable rates over time. 

Establishing a system for performance monitoring and evaluation of subcontractors throughout the project allows you to track their adherence to agreed-upon standards and use this data to inform future procurement decisions.

The Benefits of Subcontractor Procurement

When executed correctly, the steps outlined above will yield significant benefits for your construction projects. A clearer understanding of responsibilities amongst all parties involved will naturally lead to a reduced risk of scope gaps and overlaps, minimising potential disputes and ensuring all necessary work is covered. 

Improved project collaboration is another key outcome, as well-defined contracts and proactive communication will bring a more harmonious working environment, reducing friction and promoting teamwork. 

More efficient tender evaluations, made possible by clear and comparable bids, lead to quicker decision-making, keeping your projects on schedule. Even with a rigorous pre-qualification process and clearly defined quality requirements, ensure a higher standard of workmanship from your subcontractors, ultimately contributing to improved project quality and adherence to industry standards. Better control over project timelines and a reduction in delays are also direct results of efficient procurement, as engaging the right subcontractors in a timely manner prevents costly schedule disruptions. 

Ultimately, successful project delivery, underpinned by superior subcontractor management, enhances your company's reputation and leads to greater client satisfaction.

Good subcontract procurement isn’t just a procedure. it's a competitive advantage for your construction business.

Key Components of a Quality Invitation to Tender (ITT)

Tender Period

Allocate realistic timeframes based on the complexity of the tender: 2 weeks (Install-only), 2-3 weeks (Supply & Install), 3-4 weeks (Design, Supply & Install).

Tender Submission Requirements

Clearly define the required format, content (including pricing breakdown, programme, insurance, tax details), and submission method for tender responses to ensure consistency.

Contractual Information

Specify the intended form of contract (e.g., JCT, NEC), outline key terms and conditions, and detail payment terms and retention clauses upfront to avoid later negotiations.

Document List

Provide a comprehensive index of all documents included in the tender package (BoQ, Scope of Works, specifications, drawings) for easy understanding and referencing.

Value Engineering Requests

Clearly invite subcontractors to suggest practical cost-saving or quality-enhancing alternatives to your specified methods, outlining how these proposals should be presented.

Ready to Enhance Your Subcontractor Procurement Process?

At Saint Global, we specialise in helping construction businesses streamline procurement, improve bid responses, and deliver better project outcomes.

If you're ready to raise your procurement standards, enhance your project results, and win consistently profitable contracts, contact our expert team today.

Business Intelligence Brochure

industry Intelligence combined with a proactive approach to develop high quality relationships with key individuals, driving long-term results for your business.

Claim Mine!Claim Mine!

Frequently asked questions


FAQ 1: Why is effective subcontractor procurement so critical in the construction industry?

Answer: Subcontractors typically represent a significant portion (around 90%) of the total build cost, making their selection and management pivotal for project success. Effective subcontractor procurement directly impacts budget control, adherence to deadlines, and the overall quality standards of a construction project. Neglecting this process can lead to increased costs, delays, and compromised quality.

FAQ 2: What are some key steps construction businesses should take to improve their subcontractor procurement process?

Answer : This guide outlines several proven steps, including: strategic pre-qualification and thorough due diligence (evaluating financial stability, experience, capacity, location, references, and health & safety); providing a measured pricing document (Bill of Quantities) for accurate and comparable bids; drafting a clear and comprehensive Scope of Works; issuing clear and well-structured Invitations to Tender (ITTs); and conducting proactive follow-ups and mid-tender meetings to address queries and build relationships.

FAQ 3: What information should be included in a high-quality Invitation to Tender (ITT)?

Answer: A comprehensive ITT should clearly define the Tender Period (allowing realistic timeframes), specify the Tender Submission Requirements (format and content), outline crucial Contractual Information (contract form, terms, payment), provide a detailed Document List of all included materials, and may also include Value Engineering Requests to encourage innovative solutions from subcontractors.

FAQ 4: Why is providing a detailed Bill of Quantities (BoQ) so important in subcontractor procurement?

Answers: A clear BoQ ensures that all invited subcontractors price against the same scope of work, leading to genuinely like-for-like quotations and simplifying the tender evaluation process. It also helps to reduce scope gaps, minimise potential for disputes later in the project, and streamlines the management of variations and payment applications as the project progresses.

FAQ 5: What are some advanced strategies to further optimise subcontractor procurement?

Answers: Advanced strategies include leveraging technology like e-tendering platforms and procurement software to improve efficiency and transparency. Building long-term, strategic relationships with reliable subcontractors can offer consistent quality and potentially more favourable rates. Additionally, establishing a system for ongoing performance monitoring and evaluation of subcontractors helps inform future procurement decisions and ensures accountability.

This article has been provided for information purposes only. You should consult your own professional advisors for advice directly relating to your business or before taking action in relation to any of the provided content.

PS. Whenever you are ready, here's how to grow your construction business...

1. Join our Facebook Group which built completely for businesses within the construction industry. Real people, real support. - Now also available on LinkedIn.

2. Keep up to date with Construction Insider Providing you with industry insight, tips & tricks and much more to make sure you are ahead of your competitors!

3. When you are ready, Become a Saint Global client, and we will provide you with the highest quality solutions to effectively scale your construction business. Book your meeting here!

Mastering Subcontractor Procurement: A Strategic Guide for Construction Businesses

Written by the team at:

Saint Business Consultancy

Got a question? Ask us here 😉
SaintFG

How To Grow Your

🚧 Construction Businesses 🚧

Get Started With Saint

Construction Insider

What is a Virtual Assistant and What do they do?

What is a Virtual Assistant? ‍We like to think of a VA as a part of your business, your admin ‘fail-safe’. As the name suggests they are an assistant just virtual! It’s like having a personal assistant or having a receptionist, but they don’t work in your office

Next Article